Minerva Controls

Advanced Production
Planning and Scheduling

Advanced Production Planning and Scheduling

Our APS tool has the following main features:

– Production planning and scheduling;
– Production simulation;
– Production prediction;
– Feasibility analysis;
– Detection of bottlenecks;
– Update of planning;
– Visualization of future states;
– Visualization of the operation over time;
– Analysis of the impact of changes;
– Comparison of production methods.

What is APS?

Production Scheduling consists of scheduling the operation of each machine and the activities of employees involved in production to meet the stipulated planning.
Generally, production planning is carried out over a period of weeks to months and determines what will be produced. Production scheduling is carried out over a period of days to weeks and determines when and how production will be carried out.

Minerva Controls © 2024 | Privacy Policy | Cookie Policy | Code of Conduct | Terms of use